$3 m cell completed at Corangamite landfill

Published on 13 November 2026

Councillors stand in Cell 16A at Naroghid Regional Landfill.jpg

A $3 million pit the size of 76 Olympic swimming pools will cater for South West Victoria’s waste disposal needs for the next two years.

“Construction of Cell 16A was competed in mid-March after being started in November 2024,” Corangamite Shire Councillor Jamie Vogels said.

“We expect the cell will open in the coming weeks now that it has received the necessary approvals from the EPA.

“Cell 16A has a capacity of 190,125 m3 and will have an operational life of two years.”

The cells are far more than just holes in the ground, Cr Vogels said.

“They are lined with a high-tech geofabrics and low-permeability clay to seal them so no waste can escape into the environment.

“Sumps collect waste water, known as ‘leachate’ that collects in the base of the landfill.

“Fresh water is collected on site and used to keep dust down and help with revegetation.

“Gas emitted by decomposing waste is collected and flared in a closed environment where it poses no fire risk. Flaring reduces greenhouse gas emissions at the site.

“Our staff are trained to construct cells and ponds to industry standards and carry out daily and monthly inspections. Surface water, groundwater and water in ponds are all tested regularly.”

The Corangamite Regional Landfill at Naroghid takes in waste from around the south-west.

Residents are encouraged to reduce, reuse, and recycle to minimize landfill waste, conserve resources, and reduce pollution.

To find out goes in which bin, and where and how to recycle, download the Corangamite Binfo app from the Apple App Store or Google Play, or go to corangamite.vic.gov.au/Property/Rubbish-and-Recycling.